How We Price a Concrete Slab
Every installed price on this site comes from one model with 65 published inputs and 19 assumptions of our own. The inputs are prices other people publish (supplier price lists, a retailer’s shelf price, cities’ bid results, Bureau of Labor Statistics data), each listed below with its source and the date we read it. The assumptions are labelled as ours. Installed prices are not typed into pages: each one is computed from the same data file when the site is built, so a corrected input changes every page that uses it.
Four steps from price list to installed price
- Quantities. Slab volume in cubic yards from length, width and thickness, plus an overage allowance; compacted stone base; mesh or rebar for the area; form boards for the perimeter. Bagged pours use QUIKRETE’s stated yield of 0.6 cubic feet per 80 lb bag.
- Materials and delivery. Quantities times the published prices in the ledger below, with each supplier’s own short-load and delivery charges.
- Labour. Crew hours (fixed set-up hours plus hours per 100 sq ft for the thickness and steel) times BLS wages for cement masons and construction laborers, grossed up by BLS employer-cost data. The state option on the calculators swaps in that state’s BLS wages and changes nothing else.
- Overhead and margin on the direct cost, then rounding to the nearest $10.
The low figure takes the lowest published input and our lowest assumption at every step; the high figure takes the highest; typical takes the middle published price and our central assumption. The low-to-high range is wide on purpose: it is the spread between the cheapest and dearest inputs anyone publishes, not a forecast of your quote.
How We Price a Slab
Every installed price on this site comes from one model: published ready-mix and materials prices, plus crew hours priced at Bureau of Labor Statistics wages, plus overhead and margin. The low figure uses the lowest published input and our lowest assumption at every step; the high figure uses the highest. The crew hours, overage and margin are our own estimates, not published figures, and are listed below so you can check them against your quote. Worked example: a 24 x 24 ft two-car garage floor (6-inch, 4,000 PSI, #4 rebar at 18 in, broom finish, 4-inch stone base).
| Line | Low | Typical | High | Basis |
|---|---|---|---|---|
| Ready-mix concrete | $1,478 | $1,709 | $2,053 | 10.67 cu yd plus 5 to 10% overage, at published per-yard prices |
| Delivery and small-load charges | $0 | $70 | $838 | Per-truck charges from the same price lists (10 yd per truck) |
| Crushed-stone base | $375 | $468 | $638 | 4 in compacted crusher run |
| Reinforcement | $427 | $427 | $427 | #4 bar at 18 in each way, laps and chairs |
| Form lumber | $57 | $86 | $115 | Perimeter boards, shared across reuses |
| Crew labour | $1,345 | $2,247 | $3,474 | Crew hours x BLS wages x employer costs |
| Overhead and margin | $737 | $1,502 | $3,018 | 20% to 40% on direct cost |
| Installed total | $4,420 | $6,510 | $10,560 | Rounded to the nearest $10 |
Not included: excavation and soil haul-off, removing an old slab, permits, pumping, decorative finishes and sealing. Totals are national; the calculators’ state option swaps in that state’s BLS wages and leaves concrete and materials at the published lists.
Published inputs (read 13 October 2026)
- Ready-mix, per cubic yard: 3,000 PSI $127.05 to $165.00, 4,000 PSI $132.00 to $175.00, from Supreme Concrete (Los Angeles, CA), Minimix Concrete (Pequannock, NJ), Gehring Construction & Ready-Mix (Columbus, NE, list dated 2026-01-01), Scenic City Ready Mix (Tennessee, list dated 2024-08-03).
- Small orders and trucks: short-load charge $50 under 4 yd (Gehring) or $100 at 5 yd or less, plus $100 more at 2 yd or less (Scenic City); per truck, no charge within 20 miles (Gehring), a $35 surcharge (Scenic City), or $363.88 Zone A delivery plus a $55 environmental fee (Supreme).
- Crushed-stone base: $44.00 to $74.75 per cubic yard from D & L Supply (Central New York, $44.00/yd), JMJ Companies (Lynchburg, VA, $39.50/ton), Golden Landscaping Supply (Cumming, GA, $50.00/ton), Yard Works Landscape Supply (Fort Mill, SC, $74.75/yd); per-ton prices converted at 2,450 lb per yard.
- Steel, forms, poly: #4 rebar 20 ft $8.99, 6x6 10-gauge mesh 4x8 panel $6.99, 2x6x12 $14.32, 2x4x16 $12.13, 6-mil poly 8 ft 4 in x 100 ft $59.99, rebar chair $0.33 (Menards online prices; Home Depot and Lowe’s pages could not be read that day). That works out to $0.24 per sq ft for mesh and $0.74 per sq ft for a rebar grid, materials only.
- Wages: BLS OEWS 47-2051 cement masons (May 2025) 25th percentile $22.60, median $27.41, 75th $32.15 an hour; 47-2061 construction laborers $18.57, $22.66, $28.72. Employer costs from BLS ECEC June 2026, construction industry ($51.96 total compensation per $36.13 of wages, x1.44): a crew hour costs $29.60 to $43.77.
Our assumptions (estimates, not published figures)
- Crew: half cement masons, half laborers.
- Setup per job: 8 to 16 crew hours (layout, stripping, cleanup).
- Per 100 sq ft: 4-inch 4 to 7 crew hours, 6-inch 5 to 8.5, 8-inch 6 to 10; add 0.5 to 1 for mesh or 1.5 to 2.5 for rebar.
- Concrete overage 5% to 10%; base stone ordered at 1.2x its compacted volume; form boards charged at half to all of their price.
- Overhead and margin 20% to 40% of direct cost.
- 6-inch and thicker slabs use 4,000 PSI mix; thinner slabs 3,000 PSI.
Every published input, with its source
Read dates are when we last checked the price on the source. Where a price list carries its own date, that is shown as “list dated”. Prices are before tax. Bid and job-range rows are what the named city or company published for that job, shown on the pages that use them as that, not as a general rate.
Ready-mix, delivery and plant add-ons
| Source | Item | Value | Read |
|---|---|---|---|
| Supreme Concrete Los Angeles, CA | 3000 PSI 1" RK 50/50 mix | $127.05 per cu yd | Oct 13, 2026 |
| Minimix Concrete Pequannock, NJ | 3000 PSI, 3/4 mix | $136 per cu yd | Oct 13, 2026 |
| Gehring Construction & Ready-Mix Columbus, NE | SG-3000, 6 bag sand gravel | $148 per cu yd | Oct 13, 2026 list dated Jan 1, 2026 |
| Scenic City Ready Mix Tennessee | 3000 PSI, delivered, 8+ yard orders | $165 per cu yd | Oct 13, 2026 list dated Aug 3, 2024 |
| Supreme Concrete Los Angeles, CA | 4000 PSI 1" RK 50/50 mix | $132 per cu yd | Oct 13, 2026 |
| Minimix Concrete Pequannock, NJ | 4000 PSI, 3/4 mix | $142 per cu yd | Oct 13, 2026 |
| Gehring Construction & Ready-Mix Columbus, NE | SG-4000, 7 bag sand gravel | $156 per cu yd | Oct 13, 2026 list dated Jan 1, 2026 |
| Scenic City Ready Mix Tennessee | 4000 PSI, delivered, 8+ yard orders | $175 per cu yd | Oct 13, 2026 list dated Aug 3, 2024 |
| Gehring Construction & Ready-Mix Columbus, NE | Small load charge, under 4 yards | $50 per load under 4 yd | Oct 13, 2026 list dated Jan 1, 2026 |
| Scenic City Ready Mix Tennessee | Short load fee, 5 yards or less | $100 per load of 5 yd or less | Oct 13, 2026 list dated Aug 3, 2024 |
| Scenic City Ready Mix Tennessee | Additional short load fee, 2 yards or less | $100 per load of 2 yd or less | Oct 13, 2026 list dated Aug 3, 2024 |
| Gehring Construction & Ready-Mix Columbus, NE | No mileage surcharge within 20 miles (3.00 per mile one way beyond) | $0 (trip within 20 miles) | Oct 13, 2026 list dated Jan 1, 2026 |
| Scenic City Ready Mix Tennessee | Fuel / environmental surcharge per truck | $35 per truck | Oct 13, 2026 list dated Aug 3, 2024 |
| Supreme Concrete Los Angeles, CA | Delivery, Zone A, one trip (price-list example) | $363.88 per trip | Oct 13, 2026 |
| Supreme Concrete Los Angeles, CA | Environmental fee per trip | $55 per trip | Oct 13, 2026 |
| Gehring Construction & Ready-Mix Columbus, NE | Fiber Mesh, per yard | $8 per cu yd | Oct 13, 2026 list dated Jan 1, 2026 |
| Scenic City Ready Mix Tennessee | Fiber, per yard | $10 per cu yd | Oct 13, 2026 list dated Aug 3, 2024 |
| Minimix Concrete Pequannock, NJ | Fiber, per yard | $15 per cu yd | Oct 13, 2026 |
| Gehring Construction & Ready-Mix Columbus, NE | Calcium chloride (1%) | $5.50 per cu yd | Oct 13, 2026 list dated Jan 1, 2026 |
| Gehring Construction & Ready-Mix Columbus, NE | Non-chloride accelerator (1%) | $6 per cu yd | Oct 13, 2026 list dated Jan 1, 2026 |
| Gehring Construction & Ready-Mix Columbus, NE | Hot water | $5 per cu yd | Oct 13, 2026 list dated Jan 1, 2026 |
| Gehring Construction & Ready-Mix Columbus, NE | Winter service (Dec 1 to Mar 15) | $5 per cu yd | Oct 13, 2026 list dated Jan 1, 2026 |
| Minimix Concrete Pequannock, NJ | Accelerator (calcium chloride) | $11 per cu yd | Oct 13, 2026 |
| Minimix Concrete Pequannock, NJ | Accelerator (non-chloride) | $15.12 per cu yd | Oct 13, 2026 |
| Supreme Concrete Los Angeles, CA | Concrete pumping, set-up | $300 per set-up | Oct 13, 2026 |
| Supreme Concrete Los Angeles, CA | Concrete pumping, per cubic yard | $13 per cu yd | Oct 13, 2026 |
Stone base
| Source | Item | Value | Read |
|---|---|---|---|
| D & L Supply Central New York | Coarse (regular) crusher run | $44 per cu yd | Oct 13, 2026 |
| JMJ Companies Lynchburg, VA | Crusher run limestone | $39.50 per ton | Oct 13, 2026 |
| Golden Landscaping Supply Cumming, GA | Crusher run, per ton | $50 per ton | Oct 13, 2026 |
| Yard Works Landscape Supply Fort Mill, SC | Crusher run, per yard | $74.75 per cu yd | Oct 13, 2026 |
Steel, forms, poly and bagged mix
| Source | Item | Value | Read |
|---|---|---|---|
| Menards | 1/2" x 20' rebar, Grade 60 (#4), SKU 1831113 | $8.99 per 20 ft stick | Oct 13, 2026 |
| Menards | 4' x 8' reinforcing mesh panel, 10-gauge, 6" x 6" (6x6 W1.4xW1.4), SKU 1831016 | $6.99 per 4 x 8 ft panel | Oct 13, 2026 |
| Menards | 2 x 6 x 12' construction/framing lumber, SKU 1021774 | $14.32 per 12 ft board | Oct 13, 2026 |
| Menards | 2 x 4 x 16' construction/framing lumber, SKU 1021143 | $12.13 per 16 ft board | Oct 13, 2026 |
| Menards | Polar Plastics 8' 4" x 100' 6-mil clear poly sheeting, SKU 5680070 | $59.99 per 8'4" x 100' roll | Oct 13, 2026 |
| Menards | Plastic rebar chair, SKU 1831235 | $0.33 each | Oct 13, 2026 |
| Ace Hardware Calais, ME | Quikrete Concrete Mix 80 lb Gray (Mfr 110180, Ace item 5606439), price shown for the Calais, ME store | $9.99 per 80 lb bag | Oct 13, 2026 |
Labour (BLS)
| Source | Item | Value | Read |
|---|---|---|---|
| BLS OEWS May 2025 | 47-2051 Cement Masons and Concrete Finishers, 25th percentile | $22.60 per hour | Oct 13, 2026 |
| BLS OEWS May 2025 | 47-2051 Cement Masons and Concrete Finishers, median | $27.41 per hour | Oct 13, 2026 |
| BLS OEWS May 2025 | 47-2051 Cement Masons and Concrete Finishers, 75th percentile | $32.15 per hour | Oct 13, 2026 |
| BLS OEWS May 2025 | 47-2061 Construction Laborers, 25th percentile | $18.57 per hour | Oct 13, 2026 |
| BLS OEWS May 2025 | 47-2061 Construction Laborers, median | $22.66 per hour | Oct 13, 2026 |
| BLS OEWS May 2025 | 47-2061 Construction Laborers, 75th percentile | $28.72 per hour | Oct 13, 2026 |
| BLS ECEC June 2026 | Construction industry, total compensation per hour worked | $51.96 per hour | Oct 13, 2026 |
| BLS ECEC June 2026 | Construction industry, wages and salaries per hour worked | $36.13 per hour | Oct 13, 2026 |
Public bids, permits and published job ranges
| Source | Item | Value | Read |
|---|---|---|---|
| City of Chicago Department of Buildings Chicago, IL | Minimum fee, detached private garage or carport (scope-of-review factor 0.5; fee in addition to the primary residence fee), Table 14A-12-1204.3(3), Building Permit Fee Tables effective January 6, 2026 | $600 (minimum fee per permit) | Oct 13, 2026 list dated Jan 6, 2026 |
| City of De Pere, WI De Pere, WI | Project 25-19, Mudjacking Sidewalk (1,250 SF), J & S Concrete Services LLC | $3.20 per sq ft | Oct 13, 2026 list dated Jan 30, 2025 |
| City of De Pere, WI De Pere, WI | Project 25-19, Mudjacking Sidewalk (1,250 SF), Badger Concrete Lifting, LLC | $4 per sq ft | Oct 13, 2026 list dated Jan 30, 2025 |
| City of De Pere, WI De Pere, WI | Project 25-19, Mudjacking Sidewalk (1,250 SF), RaiseRite Concrete Lifting, Inc | $8 per sq ft | Oct 13, 2026 list dated Jan 30, 2025 |
| City of De Pere, WI De Pere, WI | Project 26-19, Mudjacking Sidewalk (1,000 SF), Badger Concrete Lifting LLC | $4 per sq ft | Oct 13, 2026 |
| City of De Pere, WI De Pere, WI | Project 26-19, Mudjacking Sidewalk (1,000 SF), J & S Concrete Services LLC | $6 per sq ft | Oct 13, 2026 |
| Foam Level Minneapolis-St Paul, MN | Polyurethane foam concrete lifting, small repairs, published general project range (low) | $300 per job | Oct 13, 2026 list dated Mar 18, 2026 |
| Foam Level Minneapolis-St Paul, MN | Polyurethane foam concrete lifting, small repairs, published general project range (high) | $800 per job | Oct 13, 2026 list dated Mar 18, 2026 |
| Foam Level Minneapolis-St Paul, MN | Polyurethane foam concrete lifting, sidewalk sections, published general project range (low) | $500 per job | Oct 13, 2026 list dated Mar 18, 2026 |
| Foam Level Minneapolis-St Paul, MN | Polyurethane foam concrete lifting, sidewalk sections, published general project range (high) | $1,200 per job | Oct 13, 2026 list dated Mar 18, 2026 |
| Foam Level Minneapolis-St Paul, MN | Polyurethane foam concrete lifting, driveways, published general project range (low) | $1,200 per job | Oct 13, 2026 list dated Mar 18, 2026 |
| Foam Level Minneapolis-St Paul, MN | Polyurethane foam concrete lifting, driveways, published general project range (high) | $2,500 per job | Oct 13, 2026 list dated Mar 18, 2026 |
| Foam Level Minneapolis-St Paul, MN | Polyurethane foam concrete lifting, garage floors, published general project range (low) | $1,000 per job | Oct 13, 2026 list dated Mar 18, 2026 |
| Foam Level Minneapolis-St Paul, MN | Polyurethane foam concrete lifting, garage floors, published general project range (high) | $4,500 per job | Oct 13, 2026 list dated Mar 18, 2026 |
| City of Baraboo, WI Baraboo, WI | 2026 Public Works Proposal #4 (Sidewalk Replacement), 4-inch concrete sidewalk, 6,700 S.F., Concrete Creations of Wisconsin Inc | $6.75 per sq ft | Oct 13, 2026 list dated Mar 26, 2026 |
| City of Baraboo, WI Baraboo, WI | 2026 Public Works Proposal #4 (Sidewalk Replacement), 4-inch concrete sidewalk, 6,700 S.F., Rennhack Construction, Inc | $7.48 per sq ft | Oct 13, 2026 list dated Mar 26, 2026 |
| City of Baraboo, WI Baraboo, WI | 2026 Public Works Proposal #4 (Sidewalk Replacement), 4-inch concrete sidewalk, 6,700 S.F., Augelli Concrete & Excavating, LLC | $9 per sq ft | Oct 13, 2026 list dated Mar 26, 2026 |
| City of Baraboo, WI Baraboo, WI | 2026 Public Works Proposal #4 (Sidewalk Replacement), 4-inch concrete sidewalk, 6,700 S.F., T2 Contracting, LLC | $9.50 per sq ft | Oct 13, 2026 list dated Mar 26, 2026 |
Price trend (BLS producer price index)
| Source | Item | Value | Read |
|---|---|---|---|
| BLS PPI via FRED | Ready-mix concrete manufacturing, August 2026 | 402.65 (index Jun 1981=100) | Oct 13, 2026 |
| BLS PPI via FRED | Ready-mix concrete manufacturing, August 2025 | 393.679 (index Jun 1981=100) | Oct 13, 2026 |
The parts that are our judgement
Nobody publishes how many crew hours a slab takes or what margin a contractor adds, so these are ours. They are the first thing to compare with a quote: a contractor who prices more hours, or a bigger margin, will land above our typical figure for reasons you can ask about.
| Assumption | Low | Typical | High | Why |
|---|---|---|---|---|
| share of crew hours by cement masons (rest construction laborers) | 0.5 | 0.5 | 0.5 | A finisher-led crew with an equal number of laborers |
| crew hours per job | 8 | 12 | 16 | Layout, mobilisation, form stripping and cleanup that do not scale with area (one to two crew-days on small jobs) |
| crew hours per 100 sq ft, 4-inch | 4 | 5.5 | 7 | Fine grade, spread and compact base, set forms, place, screed, float, broom and saw joints |
| crew hours per 100 sq ft, 5-inch | 4.5 | 6.25 | 8 | As 4-inch, with more concrete to place per square foot |
| crew hours per 100 sq ft, 6-inch | 5 | 6.75 | 8.5 | As 4-inch, with heavier forms and more concrete to place |
| crew hours per 100 sq ft, 8-inch | 6 | 8 | 10 | As 6-inch, with deeper forms and twice the 4-inch volume |
| extra crew hours per 100 sq ft for wire mesh | 0.5 | 0.75 | 1 | Lay, lap and tie mesh panels |
| extra crew hours per 100 sq ft for a rebar grid | 1.5 | 2 | 2.5 | Cut, place, tie and chair #4 bar at 18 inches each way |
| extra crew hours per 100 sq ft for a thickened-edge (monolithic) slab | 1 | 1.5 | 2 | Dig and form the perimeter footing |
| ordered / theoretical volume | 1.05 | 1.075 | 1.1 | Uneven subgrade, form deflection and what is left in the chute |
| loose / compacted base volume | 1.2 | 1.2 | 1.2 | Crushed stone compacts by roughly a sixth |
| share of form lumber charged to one job | 0.5 | 0.75 | 1 | Contractors reuse form boards; low assumes two uses, high a single use |
| bar length incl. laps / grid length | 1.1 | 1.1 | 1.1 | Lap splices and cut-offs add about a tenth |
| chairs per sq ft | 0.25 | 0.25 | 0.25 | One chair at about every 2 ft x 2 ft of grid |
| mesh bought / slab area | 1.1 | 1.1 | 1.1 | Panels lap one square at the edges |
| cu yd per truck trip | 10 | 10 | 10 | Standard mixer truck load; Supreme's price-list example is 10 yd on one trip |
| price / direct cost | 1.2 | 1.3 | 1.4 | Contractor overhead (insurance, vehicles, equipment, estimating, callbacks) plus profit |
| inches | 12 | 12 | 12 | Thickened-edge footing width for the foundation-slab example; your plans and frost depth set the real size |
| inches below the slab | 8 | 8 | 8 | Thickened-edge depth for the foundation-slab example; your plans and frost depth set the real size |
What the model leaves out, and what the dates mean
- Not in the model: excavation and soil haul-off, removing an old slab, permits, pumping, decorative finishes and sealing. Pages that need removal or site prep price it separately and say where the figures come from. The premiums for exposed aggregate, stamped pattern, acid stained finishes have not been checked against a published source, so no page states them as a price.
- Four ready-mix lists from four regions are a small sample. Your local supplier may sit outside the range; the cost per yard page sets the four lists side by side.
- The Updated date on each page is the last time that page’s content changed. The read dates above are when each source was last checked. They are different claims and move separately.
- Reader-shared quotes do not feed the model; the quote check shows them beside it. Their rules are on the quote check method page.
Published by Digital Signet Limited (about the site). Found a price that no longer matches its source? Email [email protected] with the page and the source.