Method Sheet

How We Price a Concrete Slab

Every installed price on this site comes from one model with 65 published inputs and 19 assumptions of our own. The inputs are prices other people publish (supplier price lists, a retailer’s shelf price, cities’ bid results, Bureau of Labor Statistics data), each listed below with its source and the date we read it. The assumptions are labelled as ours. Installed prices are not typed into pages: each one is computed from the same data file when the site is built, so a corrected input changes every page that uses it.

Step 01 / The Arithmetic

Four steps from price list to installed price

  1. Quantities. Slab volume in cubic yards from length, width and thickness, plus an overage allowance; compacted stone base; mesh or rebar for the area; form boards for the perimeter. Bagged pours use QUIKRETE’s stated yield of 0.6 cubic feet per 80 lb bag.
  2. Materials and delivery. Quantities times the published prices in the ledger below, with each supplier’s own short-load and delivery charges.
  3. Labour. Crew hours (fixed set-up hours plus hours per 100 sq ft for the thickness and steel) times BLS wages for cement masons and construction laborers, grossed up by BLS employer-cost data. The state option on the calculators swaps in that state’s BLS wages and changes nothing else.
  4. Overhead and margin on the direct cost, then rounding to the nearest $10.

The low figure takes the lowest published input and our lowest assumption at every step; the high figure takes the highest; typical takes the middle published price and our central assumption. The low-to-high range is wide on purpose: it is the spread between the cheapest and dearest inputs anyone publishes, not a forecast of your quote.

Method / How We Price

How We Price a Slab

Every installed price on this site comes from one model: published ready-mix and materials prices, plus crew hours priced at Bureau of Labor Statistics wages, plus overhead and margin. The low figure uses the lowest published input and our lowest assumption at every step; the high figure uses the highest. The crew hours, overage and margin are our own estimates, not published figures, and are listed below so you can check them against your quote. Worked example: a 24 x 24 ft two-car garage floor (6-inch, 4,000 PSI, #4 rebar at 18 in, broom finish, 4-inch stone base).

LineLowTypicalHighBasis
Ready-mix concrete$1,478$1,709$2,05310.67 cu yd plus 5 to 10% overage, at published per-yard prices
Delivery and small-load charges$0$70$838Per-truck charges from the same price lists (10 yd per truck)
Crushed-stone base$375$468$6384 in compacted crusher run
Reinforcement$427$427$427#4 bar at 18 in each way, laps and chairs
Form lumber$57$86$115Perimeter boards, shared across reuses
Crew labour$1,345$2,247$3,474Crew hours x BLS wages x employer costs
Overhead and margin$737$1,502$3,01820% to 40% on direct cost
Installed total$4,420$6,510$10,560Rounded to the nearest $10

Not included: excavation and soil haul-off, removing an old slab, permits, pumping, decorative finishes and sealing. Totals are national; the calculators’ state option swaps in that state’s BLS wages and leaves concrete and materials at the published lists.

Published inputs (read 13 October 2026)

Our assumptions (estimates, not published figures)

  • Crew: half cement masons, half laborers.
  • Setup per job: 8 to 16 crew hours (layout, stripping, cleanup).
  • Per 100 sq ft: 4-inch 4 to 7 crew hours, 6-inch 5 to 8.5, 8-inch 6 to 10; add 0.5 to 1 for mesh or 1.5 to 2.5 for rebar.
  • Concrete overage 5% to 10%; base stone ordered at 1.2x its compacted volume; form boards charged at half to all of their price.
  • Overhead and margin 20% to 40% of direct cost.
  • 6-inch and thicker slabs use 4,000 PSI mix; thinner slabs 3,000 PSI.
Step 02 / Published Inputs

Every published input, with its source

Read dates are when we last checked the price on the source. Where a price list carries its own date, that is shown as “list dated”. Prices are before tax. Bid and job-range rows are what the named city or company published for that job, shown on the pages that use them as that, not as a general rate.

Ready-mix, delivery and plant add-ons

SourceItemValueRead
Supreme Concrete
Los Angeles, CA
3000 PSI 1" RK 50/50 mix$127.05 per cu ydOct 13, 2026
Minimix Concrete
Pequannock, NJ
3000 PSI, 3/4 mix$136 per cu ydOct 13, 2026
Gehring Construction & Ready-Mix
Columbus, NE
SG-3000, 6 bag sand gravel$148 per cu ydOct 13, 2026
list dated Jan 1, 2026
Scenic City Ready Mix
Tennessee
3000 PSI, delivered, 8+ yard orders$165 per cu ydOct 13, 2026
list dated Aug 3, 2024
Supreme Concrete
Los Angeles, CA
4000 PSI 1" RK 50/50 mix$132 per cu ydOct 13, 2026
Minimix Concrete
Pequannock, NJ
4000 PSI, 3/4 mix$142 per cu ydOct 13, 2026
Gehring Construction & Ready-Mix
Columbus, NE
SG-4000, 7 bag sand gravel$156 per cu ydOct 13, 2026
list dated Jan 1, 2026
Scenic City Ready Mix
Tennessee
4000 PSI, delivered, 8+ yard orders$175 per cu ydOct 13, 2026
list dated Aug 3, 2024
Gehring Construction & Ready-Mix
Columbus, NE
Small load charge, under 4 yards$50 per load under 4 ydOct 13, 2026
list dated Jan 1, 2026
Scenic City Ready Mix
Tennessee
Short load fee, 5 yards or less$100 per load of 5 yd or lessOct 13, 2026
list dated Aug 3, 2024
Scenic City Ready Mix
Tennessee
Additional short load fee, 2 yards or less$100 per load of 2 yd or lessOct 13, 2026
list dated Aug 3, 2024
Gehring Construction & Ready-Mix
Columbus, NE
No mileage surcharge within 20 miles (3.00 per mile one way beyond)$0 (trip within 20 miles)Oct 13, 2026
list dated Jan 1, 2026
Scenic City Ready Mix
Tennessee
Fuel / environmental surcharge per truck$35 per truckOct 13, 2026
list dated Aug 3, 2024
Supreme Concrete
Los Angeles, CA
Delivery, Zone A, one trip (price-list example)$363.88 per tripOct 13, 2026
Supreme Concrete
Los Angeles, CA
Environmental fee per trip$55 per tripOct 13, 2026
Gehring Construction & Ready-Mix
Columbus, NE
Fiber Mesh, per yard$8 per cu ydOct 13, 2026
list dated Jan 1, 2026
Scenic City Ready Mix
Tennessee
Fiber, per yard$10 per cu ydOct 13, 2026
list dated Aug 3, 2024
Minimix Concrete
Pequannock, NJ
Fiber, per yard$15 per cu ydOct 13, 2026
Gehring Construction & Ready-Mix
Columbus, NE
Calcium chloride (1%)$5.50 per cu ydOct 13, 2026
list dated Jan 1, 2026
Gehring Construction & Ready-Mix
Columbus, NE
Non-chloride accelerator (1%)$6 per cu ydOct 13, 2026
list dated Jan 1, 2026
Gehring Construction & Ready-Mix
Columbus, NE
Hot water$5 per cu ydOct 13, 2026
list dated Jan 1, 2026
Gehring Construction & Ready-Mix
Columbus, NE
Winter service (Dec 1 to Mar 15)$5 per cu ydOct 13, 2026
list dated Jan 1, 2026
Minimix Concrete
Pequannock, NJ
Accelerator (calcium chloride)$11 per cu ydOct 13, 2026
Minimix Concrete
Pequannock, NJ
Accelerator (non-chloride)$15.12 per cu ydOct 13, 2026
Supreme Concrete
Los Angeles, CA
Concrete pumping, set-up$300 per set-upOct 13, 2026
Supreme Concrete
Los Angeles, CA
Concrete pumping, per cubic yard$13 per cu ydOct 13, 2026

Stone base

SourceItemValueRead
D & L Supply
Central New York
Coarse (regular) crusher run$44 per cu ydOct 13, 2026
JMJ Companies
Lynchburg, VA
Crusher run limestone$39.50 per tonOct 13, 2026
Golden Landscaping Supply
Cumming, GA
Crusher run, per ton$50 per tonOct 13, 2026
Yard Works Landscape Supply
Fort Mill, SC
Crusher run, per yard$74.75 per cu ydOct 13, 2026

Steel, forms, poly and bagged mix

SourceItemValueRead
Menards
1/2" x 20' rebar, Grade 60 (#4), SKU 1831113$8.99 per 20 ft stickOct 13, 2026
Menards
4' x 8' reinforcing mesh panel, 10-gauge, 6" x 6" (6x6 W1.4xW1.4), SKU 1831016$6.99 per 4 x 8 ft panelOct 13, 2026
Menards
2 x 6 x 12' construction/framing lumber, SKU 1021774$14.32 per 12 ft boardOct 13, 2026
Menards
2 x 4 x 16' construction/framing lumber, SKU 1021143$12.13 per 16 ft boardOct 13, 2026
Menards
Polar Plastics 8' 4" x 100' 6-mil clear poly sheeting, SKU 5680070$59.99 per 8'4" x 100' rollOct 13, 2026
Menards
Plastic rebar chair, SKU 1831235$0.33 eachOct 13, 2026
Ace Hardware
Calais, ME
Quikrete Concrete Mix 80 lb Gray (Mfr 110180, Ace item 5606439), price shown for the Calais, ME store$9.99 per 80 lb bagOct 13, 2026

Labour (BLS)

SourceItemValueRead
BLS OEWS May 2025
47-2051 Cement Masons and Concrete Finishers, 25th percentile$22.60 per hourOct 13, 2026
BLS OEWS May 2025
47-2051 Cement Masons and Concrete Finishers, median$27.41 per hourOct 13, 2026
BLS OEWS May 2025
47-2051 Cement Masons and Concrete Finishers, 75th percentile$32.15 per hourOct 13, 2026
BLS OEWS May 2025
47-2061 Construction Laborers, 25th percentile$18.57 per hourOct 13, 2026
BLS OEWS May 2025
47-2061 Construction Laborers, median$22.66 per hourOct 13, 2026
BLS OEWS May 2025
47-2061 Construction Laborers, 75th percentile$28.72 per hourOct 13, 2026
BLS ECEC June 2026
Construction industry, total compensation per hour worked$51.96 per hourOct 13, 2026
BLS ECEC June 2026
Construction industry, wages and salaries per hour worked$36.13 per hourOct 13, 2026

Public bids, permits and published job ranges

SourceItemValueRead
City of Chicago Department of Buildings
Chicago, IL
Minimum fee, detached private garage or carport (scope-of-review factor 0.5; fee in addition to the primary residence fee), Table 14A-12-1204.3(3), Building Permit Fee Tables effective January 6, 2026$600 (minimum fee per permit)Oct 13, 2026
list dated Jan 6, 2026
City of De Pere, WI
De Pere, WI
Project 25-19, Mudjacking Sidewalk (1,250 SF), J & S Concrete Services LLC$3.20 per sq ftOct 13, 2026
list dated Jan 30, 2025
City of De Pere, WI
De Pere, WI
Project 25-19, Mudjacking Sidewalk (1,250 SF), Badger Concrete Lifting, LLC$4 per sq ftOct 13, 2026
list dated Jan 30, 2025
City of De Pere, WI
De Pere, WI
Project 25-19, Mudjacking Sidewalk (1,250 SF), RaiseRite Concrete Lifting, Inc$8 per sq ftOct 13, 2026
list dated Jan 30, 2025
City of De Pere, WI
De Pere, WI
Project 26-19, Mudjacking Sidewalk (1,000 SF), Badger Concrete Lifting LLC$4 per sq ftOct 13, 2026
City of De Pere, WI
De Pere, WI
Project 26-19, Mudjacking Sidewalk (1,000 SF), J & S Concrete Services LLC$6 per sq ftOct 13, 2026
Foam Level
Minneapolis-St Paul, MN
Polyurethane foam concrete lifting, small repairs, published general project range (low)$300 per jobOct 13, 2026
list dated Mar 18, 2026
Foam Level
Minneapolis-St Paul, MN
Polyurethane foam concrete lifting, small repairs, published general project range (high)$800 per jobOct 13, 2026
list dated Mar 18, 2026
Foam Level
Minneapolis-St Paul, MN
Polyurethane foam concrete lifting, sidewalk sections, published general project range (low)$500 per jobOct 13, 2026
list dated Mar 18, 2026
Foam Level
Minneapolis-St Paul, MN
Polyurethane foam concrete lifting, sidewalk sections, published general project range (high)$1,200 per jobOct 13, 2026
list dated Mar 18, 2026
Foam Level
Minneapolis-St Paul, MN
Polyurethane foam concrete lifting, driveways, published general project range (low)$1,200 per jobOct 13, 2026
list dated Mar 18, 2026
Foam Level
Minneapolis-St Paul, MN
Polyurethane foam concrete lifting, driveways, published general project range (high)$2,500 per jobOct 13, 2026
list dated Mar 18, 2026
Foam Level
Minneapolis-St Paul, MN
Polyurethane foam concrete lifting, garage floors, published general project range (low)$1,000 per jobOct 13, 2026
list dated Mar 18, 2026
Foam Level
Minneapolis-St Paul, MN
Polyurethane foam concrete lifting, garage floors, published general project range (high)$4,500 per jobOct 13, 2026
list dated Mar 18, 2026
City of Baraboo, WI
Baraboo, WI
2026 Public Works Proposal #4 (Sidewalk Replacement), 4-inch concrete sidewalk, 6,700 S.F., Concrete Creations of Wisconsin Inc$6.75 per sq ftOct 13, 2026
list dated Mar 26, 2026
City of Baraboo, WI
Baraboo, WI
2026 Public Works Proposal #4 (Sidewalk Replacement), 4-inch concrete sidewalk, 6,700 S.F., Rennhack Construction, Inc$7.48 per sq ftOct 13, 2026
list dated Mar 26, 2026
City of Baraboo, WI
Baraboo, WI
2026 Public Works Proposal #4 (Sidewalk Replacement), 4-inch concrete sidewalk, 6,700 S.F., Augelli Concrete & Excavating, LLC$9 per sq ftOct 13, 2026
list dated Mar 26, 2026
City of Baraboo, WI
Baraboo, WI
2026 Public Works Proposal #4 (Sidewalk Replacement), 4-inch concrete sidewalk, 6,700 S.F., T2 Contracting, LLC$9.50 per sq ftOct 13, 2026
list dated Mar 26, 2026

Price trend (BLS producer price index)

SourceItemValueRead
BLS PPI via FRED
Ready-mix concrete manufacturing, August 2026402.65 (index Jun 1981=100)Oct 13, 2026
BLS PPI via FRED
Ready-mix concrete manufacturing, August 2025393.679 (index Jun 1981=100)Oct 13, 2026
Step 03 / Our Assumptions

The parts that are our judgement

Nobody publishes how many crew hours a slab takes or what margin a contractor adds, so these are ours. They are the first thing to compare with a quote: a contractor who prices more hours, or a bigger margin, will land above our typical figure for reasons you can ask about.

AssumptionLowTypicalHighWhy
share of crew hours by cement masons (rest construction laborers)0.50.50.5A finisher-led crew with an equal number of laborers
crew hours per job81216Layout, mobilisation, form stripping and cleanup that do not scale with area (one to two crew-days on small jobs)
crew hours per 100 sq ft, 4-inch45.57Fine grade, spread and compact base, set forms, place, screed, float, broom and saw joints
crew hours per 100 sq ft, 5-inch4.56.258As 4-inch, with more concrete to place per square foot
crew hours per 100 sq ft, 6-inch56.758.5As 4-inch, with heavier forms and more concrete to place
crew hours per 100 sq ft, 8-inch6810As 6-inch, with deeper forms and twice the 4-inch volume
extra crew hours per 100 sq ft for wire mesh0.50.751Lay, lap and tie mesh panels
extra crew hours per 100 sq ft for a rebar grid1.522.5Cut, place, tie and chair #4 bar at 18 inches each way
extra crew hours per 100 sq ft for a thickened-edge (monolithic) slab11.52Dig and form the perimeter footing
ordered / theoretical volume1.051.0751.1Uneven subgrade, form deflection and what is left in the chute
loose / compacted base volume1.21.21.2Crushed stone compacts by roughly a sixth
share of form lumber charged to one job0.50.751Contractors reuse form boards; low assumes two uses, high a single use
bar length incl. laps / grid length1.11.11.1Lap splices and cut-offs add about a tenth
chairs per sq ft0.250.250.25One chair at about every 2 ft x 2 ft of grid
mesh bought / slab area1.11.11.1Panels lap one square at the edges
cu yd per truck trip101010Standard mixer truck load; Supreme's price-list example is 10 yd on one trip
price / direct cost1.21.31.4Contractor overhead (insurance, vehicles, equipment, estimating, callbacks) plus profit
inches121212Thickened-edge footing width for the foundation-slab example; your plans and frost depth set the real size
inches below the slab888Thickened-edge depth for the foundation-slab example; your plans and frost depth set the real size
Step 04 / Limits

What the model leaves out, and what the dates mean

  • Not in the model: excavation and soil haul-off, removing an old slab, permits, pumping, decorative finishes and sealing. Pages that need removal or site prep price it separately and say where the figures come from. The premiums for exposed aggregate, stamped pattern, acid stained finishes have not been checked against a published source, so no page states them as a price.
  • Four ready-mix lists from four regions are a small sample. Your local supplier may sit outside the range; the cost per yard page sets the four lists side by side.
  • The Updated date on each page is the last time that page’s content changed. The read dates above are when each source was last checked. They are different claims and move separately.
  • Reader-shared quotes do not feed the model; the quote check shows them beside it. Their rules are on the quote check method page.

Published by Digital Signet Limited (about the site). Found a price that no longer matches its source? Email [email protected] with the page and the source.

Reader Questions

Didn't find your answer?

Ask us. A real person reads every question and we answer the ones we can, with sources. If your question would help other readers, we may publish an anonymised version, with your permission. General reference only.

Ask a question[email protected]