Concrete Pad Cost in 2026
An installed concrete pad runs $5 to $18 per square foot on a 20x20 or larger, in our model. Smaller pads cost more per square foot, because the set-up work and small-load charges are the same whatever the size: a 4-inch 10x10 pad with mesh is about $1,410 ($830 to $2,880). Calculator, size table and cost by pad type below.
Concrete Pad Cost Calculator
Concrete Slab Cost Calculator
Concrete Pad Cost by Size
Each row is priced by the same model: a 4-inch pad of 3,000 PSI concrete with wire mesh on a 4-inch crushed-stone base, broom finish. Low uses the lowest published price and our lowest labour assumption at every step; high uses the highest. Fixed set-up work and small-load charges are included, which is why the price per square foot falls as the pad grows.
| Pad Size | Sq Ft | Low | Typical | High | Per Sq Ft (typ.) | Typical Use |
|---|---|---|---|---|---|---|
| 8×8 | 64 | $660 | $1,160 | $2,520 | $18.12 | Small shed, equipment pad, hot tub |
| 8×10 | 80 | $730 | $1,270 | $2,680 | $15.88 | Shed pad |
| 10×10 | 100 | $830 | $1,410 | $2,880 | $14.09 | Shed, hot tub base |
| 10×12 | 120 | $920 | $1,550 | $3,080 | $12.89 | Standard shed pad |
| 12×12 | 144 | $1,030 | $1,710 | $3,330 | $11.88 | Garden shed, hot tub |
| 12×16 | 192 | $1,260 | $2,040 | $3,670 | $10.63 | Workshop shed |
| 12×20 | 240 | $1,490 | $2,370 | $4,160 | $9.88 | Large shed |
| 16×20 | 320 | $1,800 | $2,920 | $4,960 | $9.11 | Small patio |
| 20×20 | 400 | $2,180 | $3,360 | $5,620 | $8.41 | Patio |
Excludes permits, excavation beyond the stone base, and decorative finishes. AC and generator pads (3×3 to 6×6) are priced on the AC pad page: our crew-hour assumptions are set for slab jobs, not for one small equipment pad, so we do not use them below 8×8.
Cost by Pad Type
| Pad Type | Installed Cost | What Drives It |
|---|---|---|
| AC condenser and generator pad | See page | Pre-cast pads and very small pours; priced on their own page. |
| Shed pad | $920 to $3,080 for a 10×12 | 4-inch with mesh on a stone base. Under about 150 sq ft some owners mix from bags. |
| Hot tub pad | $660 to $2,520 for an 8×8 | 4-inch with wire mesh; check the tub maker's pad requirements. |
| Garage floor | $4,420 to $10,560 for a 24×24 | Normally 6-inch with a rebar grid, which is why it costs more per sq ft than a patio. |
| RV pad | $8–$19 / sq ft | 6-inch with rebar on a 6-inch base (12×40 in our model); heavier RVs may need 8 inches. |
| Pool deck | $5–$13 / sq ft | 4,000 PSI mix and a non-slip finish (600 sq ft in our model). |
| Patio | $5–$14 / sq ft | 4-inch with mesh, broom finish (20×20). Decorative finishes cost more. |
| Driveway | $5–$18 / sq ft | 4-inch mesh at the low end to 6-inch rebar at the high end (20×24). |
Low to high from our cost model at the size or spec named; per-sq-ft rows are the price per square foot for the size in the note.
Where the Money Actually Goes
- Concrete is the small part. On a 4-inch 20x20 pad, ready-mix and delivery are about 23% of the typical price in our model. Crew labour is about 40%, and overhead and margin most of the rest.
- Short-load fees. Gehring charges $50 on loads under 4 yards and Scenic City $100 at 5 yards or less. A 10×12 pad at 4 inches is about 1.48 cubic yards, so almost every small pad pays one.
- Base preparation. A 4-inch compacted stone base costs $0.65 to $1.11 per sq ft in stone at published prices. See site prep cost.
- Reinforcement. Wire mesh is about $0.24 per sq ft in materials ($0.65 installed on a 20x20), a #4 rebar grid $0.74 ($1.90 installed). Compare the two on rebar vs wire mesh.
Combine Small Pours
The fixed set-up work and the small-load charge come with each visit, not each pad. If you need an AC base, a generator pad and a shed floor, having them poured on one visit, off one delivery, means paying those once instead of three times.
Prepare every site before the crew arrives (base compacted, forms set, access clear) so everything can be poured off one delivery.
How We Price a Slab
Every installed price on this site comes from one model: published ready-mix and materials prices, plus crew hours priced at Bureau of Labor Statistics wages, plus overhead and margin. The low figure uses the lowest published input and our lowest assumption at every step; the high figure uses the highest. The crew hours, overage and margin are our own estimates, not published figures, and are listed below so you can check them against your quote. Worked example: a 10 x 10 ft (100 sq ft) pad (4-inch, 3,000 PSI, wire mesh, broom finish, 4-inch stone base).
| Line | Low | Typical | High | Basis |
|---|---|---|---|---|
| Ready-mix concrete | $165 | $188 | $224 | 1.23 cu yd plus 5 to 10% overage, at published per-yard prices |
| Delivery and small-load charges | $50 | $110 | $619 | Per-truck charges from the same price lists (10 yd per truck) |
| Crushed-stone base | $65 | $81 | $111 | 4 in compacted crusher run |
| Reinforcement | $24 | $24 | $24 | 6x6 10-gauge mesh panels, lapped |
| Form lumber | $15 | $23 | $30 | Perimeter boards, shared across reuses |
| Crew labour | $370 | $657 | $1,050 | Crew hours x BLS wages x employer costs |
| Overhead and margin | $138 | $325 | $823 | 20% to 40% on direct cost |
| Installed total | $830 | $1,410 | $2,880 | Rounded to the nearest $10 |
Not included: excavation and soil haul-off, removing an old slab, permits, pumping, decorative finishes and sealing. Totals are national; the calculators’ state option swaps in that state’s BLS wages and leaves concrete and materials at the published lists.
Published inputs (read 13 October 2026)
- Ready-mix, per cubic yard: 3,000 PSI $127.05 to $165.00, 4,000 PSI $132.00 to $175.00, from Supreme Concrete (Los Angeles, CA), Minimix Concrete (Pequannock, NJ), Gehring Construction & Ready-Mix (Columbus, NE, list dated 2026-01-01), Scenic City Ready Mix (Tennessee, list dated 2024-08-03).
- Small orders and trucks: short-load charge $50 under 4 yd (Gehring) or $100 at 5 yd or less, plus $100 more at 2 yd or less (Scenic City); per truck, no charge within 20 miles (Gehring), a $35 surcharge (Scenic City), or $363.88 Zone A delivery plus a $55 environmental fee (Supreme).
- Crushed-stone base: $44.00 to $74.75 per cubic yard from D & L Supply (Central New York, $44.00/yd), JMJ Companies (Lynchburg, VA, $39.50/ton), Golden Landscaping Supply (Cumming, GA, $50.00/ton), Yard Works Landscape Supply (Fort Mill, SC, $74.75/yd); per-ton prices converted at 2,450 lb per yard.
- Steel, forms, poly: #4 rebar 20 ft $8.99, 6x6 10-gauge mesh 4x8 panel $6.99, 2x6x12 $14.32, 2x4x16 $12.13, 6-mil poly 8 ft 4 in x 100 ft $59.99, rebar chair $0.33 (Menards online prices; Home Depot and Lowe’s pages could not be read that day). That works out to $0.24 per sq ft for mesh and $0.74 per sq ft for a rebar grid, materials only.
- Wages: BLS OEWS 47-2051 cement masons (May 2025) 25th percentile $22.60, median $27.41, 75th $32.15 an hour; 47-2061 construction laborers $18.57, $22.66, $28.72. Employer costs from BLS ECEC June 2026, construction industry ($51.96 total compensation per $36.13 of wages, x1.44): a crew hour costs $29.60 to $43.77.
Our assumptions (estimates, not published figures)
- Crew: half cement masons, half laborers.
- Setup per job: 8 to 16 crew hours (layout, stripping, cleanup).
- Per 100 sq ft: 4-inch 4 to 7 crew hours, 6-inch 5 to 8.5, 8-inch 6 to 10; add 0.5 to 1 for mesh or 1.5 to 2.5 for rebar.
- Concrete overage 5% to 10%; base stone ordered at 1.2x its compacted volume; form boards charged at half to all of their price.
- Overhead and margin 20% to 40% of direct cost.
- 6-inch and thicker slabs use 4,000 PSI mix; thinner slabs 3,000 PSI.
Sources: BLS OEWS 47-2051 cement masons (May 2025), BLS OEWS 47-2061 construction laborers (May 2025), BLS ECEC, construction (June 2026), ready-mix price lists from Supreme Concrete, Minimix Concrete, Gehring Construction & Ready-Mix, Scenic City Ready Mix, crusher-run prices from D & L Supply, JMJ Companies, Golden Landscaping Supply, Yard Works Landscape Supply, Menards mesh, rebar, lumber and poly prices, IRC R506.1 and R506.2.2. All read 13 October 2026. Crew hours, overage, overhead and margin are our estimates and are listed in the method above.